top of page

SOUTH GATE MASTER PLAN/RECONSTRUCTION - SD NATIONAL GUARD

Stanley Design Group collaborated with FMG Engineering, Inc. to master plan Camp Rapid’s new South Gate along Canyon Lake Drive.  FMG Engineering provide surface, vehicle movement, security, and storm-water design.  Stanley Design Group provided planting design and perimeter wall design.  In addition, our designers reviewed pedestrian connections to Canyon Lake Drive.  The final design was accepted by the South Dakota National Guard and utilized for budgeting purposes.  

South Gate
South Gate
bottom of page